野花日本视频网站_国产精品自产拍视频_99福利视频一区二区三区_韩国亚洲伊人久久综合影院_亚洲国产另类久久久精品黑人

您好,歡迎訪問山東燊赫通風(fēng)設(shè)備有限公司網(wǎng)站!

服務(wù)熱線

13210558111

風(fēng)管的安裝怎么做到快速?

來源:http://www.adr7.cn/     發(fā)布時(shí)間:2019-07-23  

  顧名思義,“管道”是一種輸送空氣的管道,所以當(dāng)空氣流出或進(jìn)入設(shè)備時(shí),它就被使用。在安裝管道的時(shí)候還有一些事情需要注意,所以讓我來告訴你。
  As the name implies, "pipeline" is a kind of pipeline for conveying air, so when air flows out or enters the equipment, it is used. There are other things that need attention when installing pipes, so let me tell you.
  1. 施工區(qū)域的布線和施工設(shè)備的布線應(yīng)由現(xiàn)場電工操作人員進(jìn)行。不要隨意撿起和拉起。
  1. The wiring of the construction area and the wiring of the construction equipment shall be carried out by the field electrical operators. Don't pick it up and pull it up at will.
  2. 各種機(jī)器應(yīng)嚴(yán)格按照操作規(guī)程操作。
  2. All kinds of machines should be operated in strict accordance with the operating rules.
  3、在風(fēng)管運(yùn)輸和安裝過程中一定要注意保護(hù)成品,防止對(duì)鍍鋅表面造成損壞。
  3. Attention must be paid to the protection of finished products during the transportation and installation of ducts to prevent damage to galvanized surfaces.
  4. 操作切割機(jī)時(shí),必須有合格人員的保護(hù)和操作。
  4. When operating the cutting machine, it must be protected and operated by qualified personnel.
  有許多民用建筑管道。嚴(yán)禁施工、休息、通行。
  There are many civil building pipes. Construction, rest and passage are strictly prohibited.
  6. 嚴(yán)禁無證作業(yè),嚴(yán)禁酒后操作,嚴(yán)禁生病。
  6. No undocumented work, no drunk operation and no illness.
  7. 配電箱在施工過程中應(yīng)配置并定期檢查。
  7. Distribution boxes should be safely allocated and regularly inspected during construction.
  8. 負(fù)責(zé)人應(yīng)在上課前做演講,并有針對(duì)性。
  8. The person in charge should give a safety speech before class, and be targeted.
  9. 然后轉(zhuǎn)到特定的操作員那里。
  9. Then go to a specific operator.
  10. 未完成項(xiàng)目嚴(yán)格按照《施工操作規(guī)范》和指導(dǎo)方針執(zhí)行,嚴(yán)格按照項(xiàng)目部施工單位的進(jìn)場要求執(zhí)行。
  10. Unfinished projects shall be implemented strictly in accordance with the Code for Safe Operation of Construction and the guidelines, and strictly in accordance with the requirements of the construction units of the Project Department.
山東通風(fēng)管道加工
  重慶風(fēng)管、重慶風(fēng)管加工、重慶風(fēng)管安裝、重慶風(fēng)管工程、重慶風(fēng)管設(shè)計(jì)、重慶風(fēng)管處理、重慶風(fēng)管安裝、重慶風(fēng)管設(shè)計(jì)
  Chongqing duct, Chongqing duct processing, Chongqing duct installation, Chongqing duct engineering, Chongqing duct design, Chongqing duct treatment, Chongqing duct installation, Chongqing duct design
  安裝前應(yīng)先繪制設(shè)計(jì)圖紙,然后按圖紙要求進(jìn)行安裝:
  Before installation, design drawings should be drawn and then installed according to the requirements of drawings.
  1. 為了在清潔的環(huán)境中工作,安裝前應(yīng)周圍的灰塵,并保持與手接觸的部件的清潔;
  1. In order to work in a clean environment, dust should be removed before installation and the parts in contact with hands should be kept clean.
  2. 然后根據(jù)管道類型將其放置在清潔的環(huán)境中;
  2. Place it in a clean environment according to the type of pipe.
  3.按照圖紙上的安裝系統(tǒng)編號(hào)順序懸掛風(fēng)管。安裝每個(gè)系統(tǒng)時(shí),從部分開始。各系統(tǒng)的拉鏈頭在6點(diǎn)鐘方向;
  3. Hang up the air duct according to the installation system number on the drawings. When installing each system, start with the first part. The zipper heads of each system are in the direction of 6 o'clock.
  4. 根據(jù)風(fēng)管上的標(biāo)簽從小到大懸掛。
  4. Hang from small to large according to the label on the duct.
  5. 每個(gè)系統(tǒng)掛好后,風(fēng)管變平,后一個(gè)掛鉤用鎖固定,沒有任何褶皺。
  5. After each system is hooked up, the air duct becomes flat, and the last hook is fixed with a lock without any wrinkles.

上一篇:濟(jì)南廚房排煙罩的設(shè)計(jì)要考慮哪些因素?
下一篇:廚房排煙罩設(shè)計(jì)有什么不合理的地方?