螺旋風(fēng)管主要施工方案是怎樣的?

來(lái)源:http://www.adr7.cn/     發(fā)布時(shí)間:2020-04-02  

  螺旋風(fēng)管主要施工方案是怎樣的?您了解嗎?下面我們就具體的為您介紹一下。
  What is the main construction scheme of spiral air duct? Do you understand? Let's introduce it to you.
  1、拆除原有非金屬風(fēng)管,并拆除原有風(fēng)管支架.并對(duì)所拆除管道及吊件進(jìn)行搬遷及放置。
  1. Remove the original non-metallic air duct, remove the original air duct support, and remove and place the removed pipes and hangers.
  2、對(duì)拆除現(xiàn)場(chǎng)進(jìn)行放樣。根據(jù)設(shè)計(jì)圖紙尺寸進(jìn)行相關(guān)的放樣,如圖紙有相關(guān)的尺寸或者其他缺陷,再與甲方進(jìn)行相關(guān)的溝通。
  2. Set out the demolition site. Relevant lofting shall be carried out according to the dimensions of the design drawings. If there are relevant dimensions or other defects in the drawings, then relevant communication shall be carried out with Party A.
  3、支架吊裝。支架安裝除圖紙上除有注明夕卜其余均按《通風(fēng)工程施工與質(zhì)量驗(yàn)收標(biāo)準(zhǔn)》相關(guān)標(biāo)準(zhǔn)進(jìn)行安裝。
  3. Support hoisting. The support installation shall be carried out in accordance with the relevant standards of ventilation engineering construction and quality acceptance standard unless otherwise indicated on the drawings.
  4、螺旋風(fēng)管安裝。螺旋風(fēng)管安裝時(shí)將嚴(yán)格按照《通風(fēng)工程施工與質(zhì)量驗(yàn)收標(biāo)準(zhǔn)》相關(guān)標(biāo)準(zhǔn)進(jìn)行安裝。
  4. Spiral air duct installation. The spiral air duct shall be installed in strict accordance with the relevant standards of ventilation engineering construction and quality acceptance standard.
  5、螺旋風(fēng)管的連接。螺旋風(fēng)管之聞的連接采用法蘭連接.具體的連接方式均按圖紙上所設(shè)計(jì)的要求及《通風(fēng)工程施工與質(zhì)量驗(yàn)收標(biāo)準(zhǔn)》相關(guān)標(biāo)準(zhǔn)進(jìn)行安裝。
  5. Connection of spiral duct. Flange connection shall be adopted for the connection of spiral air duct. The specific connection mode shall be installed according to the design requirements on the drawings and relevant standards of ventilation engineering construction and quality acceptance standard.
濟(jì)南排煙罩
  6、風(fēng)管水平安裝及垂直安裝時(shí)整體水平及垂直度均按照《通風(fēng)工程施工與質(zhì)量驗(yàn)收標(biāo)準(zhǔn)》相關(guān)標(biāo)準(zhǔn)進(jìn)行安裝。
  6. During horizontal and vertical installation of air duct, the overall level and perpendicularity shall be installed in accordance with relevant standards of ventilation engineering construction and quality acceptance standard.
  7、法蘭及安裝支架或相關(guān)的安裝輔件將嚴(yán)格設(shè)計(jì)圖紙上相關(guān)規(guī)格及要求進(jìn)行制作。圖紙如無(wú)體現(xiàn),將嚴(yán)格相關(guān)條例進(jìn)行制作。
  7. Flange, mounting bracket or relevant installation accessories shall be made in strict accordance with relevant specifications and requirements on the design drawings. If the drawings are not reflected, they will be produced in strict accordance with the relevant national regulations.
  有關(guān)螺旋風(fēng)管、鍍鋅風(fēng)管濟(jì)南排煙罩等方面的問(wèn)題請(qǐng)及時(shí)聯(lián)系我們,我們恭候您的光臨:http://www.adr7.cn/
  Please contact us in time for questions about spiral air duct, galvanized air duct Jinan smoke hood and so on. We are looking forward to your visit: http://www.adr7.cn/