通風(fēng)管道安裝加工前需要準(zhǔn)備哪些條件?

來源:http://www.adr7.cn/     發(fā)布時(shí)間:2020-04-21  

  山東通風(fēng)管道加工安裝應(yīng)具備的條件:
  The requirements for processing and installation of ventilation pipes in Shandong Province are as follows:
  (1)濟(jì)南通風(fēng)管道的處理?xiàng)l件
  (1) Treatment conditions of Jinan ventilation pipeline
  1. 一般排風(fēng)機(jī)系統(tǒng)和空調(diào)系統(tǒng)的安裝應(yīng)在建筑物圍護(hù)結(jié)構(gòu)已建好、障礙物已、地面無雜物的情況下進(jìn)行。
  1. The general exhaust fan system and air conditioning system shall be installed when the building envelope has been built, the obstacles have been removed and the ground is free of sundries.
  2. 空氣凈化系統(tǒng)的安裝,應(yīng)在建筑物內(nèi)部構(gòu)件安裝、墻壁已抹灰、室內(nèi)無灰塵或防塵措施的地面上進(jìn)行。
  2. The installation of air purification system shall be carried out on the ground where the internal components of the building are installed, the walls are plastered, and there is no dust or dust-proof measures in the room.
  3、一般除塵系統(tǒng)風(fēng)道安裝應(yīng)在車間內(nèi)進(jìn)行,安裝好工藝設(shè)備后或設(shè)備底座已確定,設(shè)備接頭、罩體位置已確定。
山東通風(fēng)管道加工
  3. Generally, the air duct of dust removal system shall be installed in the workshop. After the process equipment is installed or the equipment base has been determined, and the position of equipment joint and cover body has been determined.
  4. 現(xiàn)場檢查預(yù)留孔的位置和尺寸是否符合圖紙要求。每一面都比實(shí)際截面大100毫米。
  4. Check whether the position and size of the reserved holes meet the requirements of the drawings on site. Each side is 100 mm larger than the actual section.
  5、作業(yè)現(xiàn)場應(yīng)具備相應(yīng)的輔助設(shè)施,如梯子、貨架、防護(hù)、消防器材、施工人員的技術(shù)、質(zhì)量、等。
  5. The operation site shall be equipped with corresponding auxiliary facilities, such as ladders, shelves, safety protection, fire fighting equipment, technology, quality and safety of construction personnel, etc.
  (2)濟(jì)南通風(fēng)管道加工材料要求
  (2) Jinan ventilation pipe processing material requirements
  通風(fēng)管
  Vent pipe
  1. 各類板材、管材必須有質(zhì)量證明文件(包括出廠證明、質(zhì)量證書、檢測報(bào)告)和產(chǎn)品清單。
  1. All kinds of plates and pipes must have quality certificates (including factory certificates, quality certificates, test reports) and product lists.
  2. 成品風(fēng)道內(nèi)不得有變形、變形、開裂、孔洞、法蘭脫落、開焊、缺鉚接、缺螺栓孔等缺陷。
  2. There shall be no deformation, deformation, crack, hole, flange falling off, open welding, lack of riveting, lack of bolt hole and other defects in the finished air duct.
  3、閥體內(nèi)安裝消聲器、罩體、風(fēng)口等部件應(yīng)檢查調(diào)節(jié)裝置是否靈活,漆膜、漆膜是否損壞。
  3. If the muffler, cover, air vent and other parts are installed in the valve body, check whether the regulating device is flexible and whether the paint film and paint film are damaged.
  4. 安裝材料:螺栓、螺母、墊圈、墊片、密封條、自攻螺釘、拉拔鉚釘、焊條、各種帆布、無紡布、射釘、膨脹螺栓等,應(yīng)符合產(chǎn)品質(zhì)量要求。
  4. Installation materials: bolts, nuts, washers, gaskets, sealing strips, self tapping screws, pull rivets, welding rods, various canvas, non-woven fabrics, shooting nails, expansion bolts, etc., which shall meet the product quality requirements.
  (3)濟(jì)南通風(fēng)管道加工施工設(shè)備
  (3) Jinan ventilation pipe processing and construction equipment
  手錘、電錘、手搖鉆、手鋸、電動雙刃剪、砂輪鋸、角磨機(jī)、臺鉆、電焊工具、扳手、螺絲刀、手剪、鏈條、高凳、大繩、尖銳沖頭、釘槍、毛刷等。
  Hammers, electric hammers, hand drills, hand saws, electric double-edged shears, wheel saws, angle grinders, bench drills, welding tools, wrenches, screwdrivers, hand shears, chains, high stools, large ropes, sharp punches, nail guns, brushes, etc.
  以上是山東通風(fēng)管道加工公司為大家介紹的相關(guān)內(nèi)容,想要了解更多內(nèi)容,歡迎訪問網(wǎng)站:http://www.adr7.cn
  The above is the relevant content introduced by Shandong ventilation pipe processing company. For more information, please visit the website: http://www.adr7.cn