野花日本视频网站_国产精品自产拍视频_99福利视频一区二区三区_韩国亚洲伊人久久综合影院_亚洲国产另类久久久精品黑人

您好,歡迎訪問山東燊赫通風(fēng)設(shè)備有限公司網(wǎng)站!

服務(wù)熱線

13210558111

通風(fēng)管道加工如何安裝要符合的規(guī)定?

來源:http://www.adr7.cn/     發(fā)布時間:2021-03-29  

吊架安裝對管道起著支承重量、平衡介質(zhì)反力、限制位移和防止震動等作用。因此就需要施工人員了解安裝吊架的規(guī)定,才能更好的完成通風(fēng)管道施工工程,
The installation of hanger plays the role of supporting weight, balancing medium reaction, limiting displacement and preventing vibration. Therefore, it is necessary for the construction personnel to understand the installation of hangers in order to better complete the ventilation pipeline construction project,
通風(fēng)管道加工安裝要符合的規(guī)定:
Requirements for processing and installation of ventilation pipes:
(1)管道風(fēng)機采用減震吊架安裝時,風(fēng)機與減震吊架連接緊密,牢固可靠;采用支拖架安裝時,風(fēng)機與減震器及支架、托架連接緊密,穩(wěn)固可靠。
(1) When the pipeline fan is installed with the shock absorption hanger, the fan and the shock absorption hanger are closely connected, firm and reliable; when the support trailer is used for installation, the fan and the shock absorber, support and bracket are closely connected, firm and reliable.
(2)離心風(fēng)機與減震臺座接觸緊密,螺栓擰緊,并有防松裝置。
(2) The centrifugal fan is in close contact with the shock absorption pedestal, the bolts are tightened, and there is a locking device.
(3)通風(fēng)管道廠家告訴大家風(fēng)機試運轉(zhuǎn)時,葉輪旋轉(zhuǎn)方向正確,經(jīng)不少于2H運轉(zhuǎn)后,滑動軸承溫升不超過35度,盡量溫度不超過70度;滾動軸承溫升不超過40度,盡量溫度不超過80度。
(3) The ventilation duct manufacturer told us that during the trial operation of the fan, the rotation direction of the impeller is correct. After running for no less than 2 hours, the temperature rise of the sliding bearing should not exceed 35 degrees, and the temperature should not exceed 70 degrees as far as possible; the temperature rise of the rolling bearing should not exceed 40 degrees, and the temperature should not exceed 80 degrees as far as possible.
當前普遍存在的問題是成品通風(fēng)道燃燒性能和耐火極限未經(jīng)有關(guān)部門檢測,山東通風(fēng)管道加工且部分通風(fēng)道材料的燃燒性能、管壁厚度不符合要求。
At present, the common problems are that the combustion performance and fire resistance of the finished ventilation duct have not been tested by the relevant national departments, and the processing of Shandong ventilation duct, and the combustion performance and wall thickness of some ventilation duct materials do not meet the requirements.
1、風(fēng)機、空調(diào)機組、風(fēng)機盤等設(shè)備的支、吊架設(shè)計要求設(shè)置隔振器,其品種、規(guī)格應(yīng)符合設(shè)計及產(chǎn)品技術(shù)文件要求。
1. The supports and hangers of fans, air conditioning units, fan panels and other equipment shall be designed with vibration isolators, and their varieties and specifications shall meet the requirements of design and product technical documents.
2、風(fēng)管垂直安裝,間距不應(yīng)大于4m,單根直管少應(yīng)有2個固定點。
2. The air duct shall be installed vertically, the spacing shall not be more than 4m, and a single straight pipe shall have at least two fixed points.
3、吊架的螺孔應(yīng)采用機械加工,吊桿應(yīng)平直,螺紋完整、光潔。
3. The screw hole of the hanger shall be machined, the hanger rod shall be straight, and the thread shall be complete and smooth.
4、長度超過20m的水平懸吊風(fēng)管,在山東通風(fēng)管道時少設(shè)置1個防晃支架。
4. At least one anti sway support shall be set for horizontal suspended duct with length over 20m in Shandong ventilation duct.
5、支吊架不宜設(shè)置在風(fēng)口、閥門、檢查門及自控機構(gòu)處,離風(fēng)口或插接管的距離不宜小于200mm。
5. The support and hanger should not be set at the air outlet, valve, inspection door and automatic control mechanism, and the distance from the air outlet or plug-in pipe should not be less than 200 mm.

上一篇:濟南通風(fēng)管道用于降溫時的注意事項
下一篇:提高通風(fēng)管道加工質(zhì)量的方法