野花日本视频网站_国产精品自产拍视频_99福利视频一区二区三区_韩国亚洲伊人久久综合影院_亚洲国产另类久久久精品黑人

您好,歡迎訪問(wèn)山東燊赫通風(fēng)設(shè)備有限公司網(wǎng)站!

服務(wù)熱線

13210558111

螺旋風(fēng)管的安裝注意事項(xiàng)!

來(lái)源:http://www.adr7.cn/     發(fā)布時(shí)間:2023-03-30  

螺旋風(fēng)管安裝是十分重要的環(huán)節(jié),通風(fēng)、空調(diào)工程的主要工作集中在風(fēng)管的安裝上。因此要做好掌握多功能消聲管的技術(shù)特性,熟悉施工圖,了解土建和其它工種同本工種的相關(guān)情況,核實(shí)風(fēng)管系統(tǒng)的標(biāo) 高,軸線、預(yù)留孔洞,預(yù)埋件等是否符合安裝條件。備足安裝用的各類輔助材料,準(zhǔn)備好吊裝機(jī)具和安裝用的其它工具,對(duì)風(fēng)管系統(tǒng)劃線定位等工作。
The installation of spiral air ducts is a very important link, and the main work of ventilation and air conditioning engineering focuses on the installation of air ducts. Therefore, it is necessary to master the technical characteristics of multi-functional silencing pipes, be familiar with construction drawings, understand the relevant conditions of civil engineering and other professional types of work with this type of work, and verify whether the elevation, axis, reserved holes, and embedded parts of the air duct system meet the installation conditions. Prepare various auxiliary materials for installation, hoisting machines and other tools for installation, and mark and position the air duct system.
風(fēng)管的組對(duì):將成品或預(yù)制好的風(fēng)管運(yùn)安裝地點(diǎn),結(jié)合實(shí)際情況進(jìn)行檢查、復(fù)核,再按編號(hào)進(jìn)行排列,風(fēng)管系統(tǒng)的各部分尺寸和角度確認(rèn)準(zhǔn)確無(wú)誤后,即開(kāi)始風(fēng)管組對(duì)工作。風(fēng)管各管段之間的連接采用法蘭連接,接口處要求嚴(yán)密不漏風(fēng)。
Air duct assembly: Transport the finished or prefabricated air duct to the installation site, inspect and recheck it based on the actual situation, and then arrange it according to the number. After confirming that the dimensions and angles of each part of the air duct system are correct, the air duct assembly work begins. The connection between each pipe section of the air duct shall be flange connected, and the interface shall be tight without air leakage.
山東通風(fēng)管道加工
一次吊裝風(fēng)管的長(zhǎng)度要根據(jù)建筑物的條件,風(fēng)管的壁厚,吊裝方法和吊裝機(jī)具配備情況確定,組對(duì)好的風(fēng)管可把兩端的法蘭做為基準(zhǔn)點(diǎn),以中間法蘭為測(cè)點(diǎn),拉線測(cè)量風(fēng)管的連 接是否平直,偏差大時(shí)要進(jìn)行調(diào)整,吊裝前,要對(duì)風(fēng)管支、吊架,吊裝機(jī)具,選用吊裝機(jī)具的支、吊點(diǎn),是否正確、牢固進(jìn)行檢查,起吊前要仔細(xì)檢查,把桿、 滑輪、繩索等是否 固定,綁扎可靠并要吊裝范圍內(nèi)的各種不因素。起吊時(shí),要進(jìn)行試吊,當(dāng)離地200-300毫米時(shí),停止起升,再一次對(duì)吊裝機(jī)具進(jìn)行一次檢查,確認(rèn)無(wú)誤后,繼續(xù)起升到所需高度。把風(fēng)管固定在支、吊架上之后,才能解開(kāi)繩索,拆移吊裝 機(jī)具。
The length of the primary air duct to be lifted should be determined based on the conditions of the building, the wall thickness of the air duct, the lifting method, and the allocation of lifting equipment. After the air duct is assembled, the flanges at both ends can be used as reference points, and the intermediate flange can be used as the measuring point. Draw a line to measure whether the connection of the air duct is straight. If there is a large deviation, it should be adjusted. Before lifting, the support and hanger of the air duct, the lifting equipment, and the support and lifting points of the lifting equipment should be selected to determine whether they are correct Check firmly. Before lifting, carefully check whether the rods, pulleys, ropes, etc. are fixed, and whether the binding is reliable. All unsafe factors within the lifting range must be removed. During lifting, a trial lifting should be carried out. When 200-300mm above the ground, the lifting should be stopped, and a comprehensive inspection of the lifting equipment should be conducted again. After confirming that there is no error, the lifting should continue to the required height. After fixing the air duct on the support and hanger, the rope can be loosened and the lifting equipment can be removed.
水平干管經(jīng)找平找正并固定在支、吊架上后,就可進(jìn)行支管的安裝。立管可在水平干管安裝前進(jìn)行安裝,支架間距不應(yīng)大于4米,每根立管固定件不應(yīng)少于二個(gè)。風(fēng)管水平安裝,水平度的允許偏差每米不應(yīng)大于3毫米,總偏差不應(yīng)大于20毫米,風(fēng)管垂 直安裝,垂直度的允許偏差每米不應(yīng)大于2毫米,總偏差不應(yīng)大于20毫米。
After leveling and aligning the horizontal main pipe and fixing it on the supports and hangers, the branch pipe can be installed. The riser can be installed before the installation of the horizontal main pipe. The spacing between supports should not be greater than 4 meters, and each riser should have at least two fasteners. For horizontal installation of air ducts, the allowable deviation for levelness should not be greater than 3mm per meter, and the total deviation should not be greater than 20mm. For vertical installation of air ducts, the allowable deviation for perpendicularity should not be greater than 2mm per meter, and the total deviation should not be greater than 20mm.

上一篇:酒店及餐飲廚房排煙常見(jiàn)問(wèn)題的解決
下一篇:廚房排煙管道系統(tǒng)制作材質(zhì)!