消防管道加工安裝要注意什么?

來(lái)源:http://www.adr7.cn/     發(fā)布時(shí)間:2022-12-02  

人防工程不同于普通地下室。普通地下室是為穩(wěn)定地上建筑物或?qū)崿F(xiàn)某種用途而建的,沒(méi)有 防護(hù)等級(jí)要求。防空地下室是根據(jù)人防工程防護(hù)要求專門設(shè)計(jì)的。
Civil air defense works are different from ordinary basements. The ordinary basement is built to stabilize the above ground buildings or achieve a certain purpose, and there is no requirement for protection grade. The air defense basement is specially designed according to the protection requirements of civil air defense projects.
人防通風(fēng)排煙設(shè)備安裝:
Installation of ventilation and smoke exhaust equipment for civil air defense:
所有設(shè)備必須在設(shè)備到貨后核對(duì)其基礎(chǔ)尺寸,經(jīng)確認(rèn)正確無(wú)誤后方可安裝,否則須請(qǐng)土建工種依設(shè)備修改基礎(chǔ)并達(dá)到設(shè)計(jì)要求后再行安裝,基礎(chǔ)表面必須按設(shè)計(jì)標(biāo)高找平抹光。
All equipment must be checked for its foundation size after arrival of the equipment, and can be installed only after it is confirmed to be correct. Otherwise, civil engineering workers must modify the foundation according to the equipment and meet the design requirements before installation. The foundation surface must be leveled and polished according to the design elevation.
風(fēng)管穿過(guò)防火墻樓板處應(yīng)使用不燃材料封堵。防火閥設(shè)單獨(dú)吊支架,安裝位置正確與設(shè)計(jì)相符,與氣流方向與閥體標(biāo)志的箭頭一致。
The place where the air duct passes through the firewall floor shall be blocked with incombustible materials. The fire damper shall be provided with a separate hanging bracket, and the installation position shall be correct and consistent with the design, and the air flow direction shall be consistent with the arrow marked on the valve body.
風(fēng)閥消聲器等部件安裝時(shí)必須清 除內(nèi)表面的油污和塵土。
山東通風(fēng)管道加工
During the installation of air valve muffler and other components, oil dirt and dust on the inner surface must be removed.
風(fēng)機(jī)安裝:風(fēng)機(jī)在安裝前應(yīng)檢查葉輪與機(jī)殼間的間隙是否符合設(shè)備技術(shù)文件的要求,葉輪與機(jī)殼間有無(wú)碰殼現(xiàn)象,葉輪轉(zhuǎn)動(dòng)是否靈活,接通電源檢查葉輪旋轉(zhuǎn)方向,出風(fēng)方向是否正確,支吊托架應(yīng)設(shè)隔振裝置,根據(jù)風(fēng)機(jī)重量制作相應(yīng)的支吊架,支吊托架安裝牢固可靠,機(jī)體安裝后應(yīng)有鎖緊裝置。當(dāng)風(fēng)機(jī)固定在樓板上時(shí),吊桿膨脹螺栓應(yīng)穿通樓板面。
Fan installation: before the installation of the fan, check whether the clearance between the impeller and the casing meets the requirements of the technical documents of the equipment, whether the impeller and the casing collide with each other, whether the impeller rotates flexibly, connect the power supply to check whether the rotation direction of the impeller and the air outlet direction are correct, and the support and lifting brackets shall be equipped with vibration isolation devices. The corresponding support and lifting brackets shall be made according to the weight of the fan. The support and lifting brackets shall be installed firmly and reliably, and the body shall be equipped with locking devices after installation. When the fan is fixed on the floor, the boom expansion bolt should go through the floor.
風(fēng)管上的調(diào)節(jié)閥防火閥按有關(guān)設(shè)計(jì)施工圖的要求及規(guī)范的規(guī)定安裝,氣流方向應(yīng)正確,安裝前必須檢驗(yàn)其靈活性和可靠性,安裝時(shí)注意閥柄要操作方便,保溫操作時(shí)切忌影響閥村和閥柄的運(yùn)動(dòng)。
The fire damper of the regulating valve on the air duct shall be installed according to the requirements of the relevant design and construction drawings and the provisions of the specifications. The air flow direction shall be correct. Before installation, its flexibility and reliability must be checked. During installation, attention shall be paid to the convenient operation of the valve handle. During insulation operation, the movement of the valve village and the valve handle must not be affected.
油網(wǎng)過(guò)濾器的安裝,安裝前應(yīng)用60~70%的蘇打水溶液清洗干凈,風(fēng)干后浸上20#機(jī)油,靜淋3~5分鐘后再裝入除塵過(guò)濾箱或框架上。安裝時(shí)將孔眼大的網(wǎng)層置于空氣進(jìn)入側(cè)。過(guò)濾吸收器安裝,平時(shí)嚴(yán)禁打開(kāi)進(jìn)出口的密封蓋,以免受潮,只就位不連接,有關(guān)配件要放置有序。安裝時(shí)注意濾煙層在前,濾毒層在后,發(fā)現(xiàn)金屬表面生銹應(yīng)及時(shí)除銹。在管道之間用法蘭之間應(yīng)墊4~5毫米的橡膠墊片(過(guò)濾器兩端自帶)。
Before the installation of oil strainer, clean it with 60~70% soda water solution, soak it with 20 # engine oil after air drying, and put it into the dust removal filter box or frame after 3~5 minutes of static pouring. During installation, place the mesh layer with large eyelet on the air inlet side. During the installation of filter absorber, it is strictly forbidden to open the sealing cover at the inlet and outlet in order to avoid being affected by moisture. It is only in place and not connected. The relevant accessories should be placed in order. During installation, pay attention to the smoke filter layer in front and the poison filter layer behind. If rust is found on the metal surface, the rust shall be removed in time. 4~5mm rubber gasket shall be placed between flanges between pipes (both ends of the filter are provided).
密閉閥安裝時(shí)應(yīng)確保將閥體上的箭頭
When installing the closed valve, ensure that the arrow on the valve body

上一篇:廚房排煙設(shè)備通風(fēng)管道要注意什么條件?
下一篇:不銹鋼風(fēng)管的空氣流動(dòng)要注意些什么?